- Further PCB installation, with the end of the panel very much in sight - Jerry carefully threads the ribbon cable down towards the correct socket on the TC64 units.
- ...whilst Peter gets to grips with making as many power jumper cables for the PCBs as possible.
- The computer desk comes into its own as panel testing continues...
- More installation & fault-finding in progress, with Danny to the fore!
- There's still plenty of tag block work to complete, yet Jamie's rapid soldering skills mean that Swindon Station is getting ever closer.
- Behind the panel, John installs the first PCB into Rack 1, the final rack to receive them - well done that man!
- Meanwhile, the Bristol Group install the first lamps back into their Bristol East panel - can you spot them among all that daylight?
- Outside, the new pathway boundary wall takes shape, with further works on the air-raid shelter (extreme left) also continuing apace.
- As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.
- Building works continue, with the two loft areas receiving their flooring.