Further PCB installation, with the end of the panel very much in sight - Jerry carefully threads the ribbon cable down towards the correct socket on the TC64 units.
...whilst Peter gets to grips with making as many power jumper cables for the PCBs as possible.
The computer desk comes into its own as panel testing continues...
More installation & fault-finding in progress, with Danny to the fore!
There's still plenty of tag block work to complete, yet Jamie's rapid soldering skills mean that Swindon Station is getting ever closer.
Behind the panel, John installs the first PCB into Rack 1, the final rack to receive them - well done that man!
Meanwhile, the Bristol Group install the first lamps back into their Bristol East panel - can you spot them among all that daylight?
Outside, the new pathway boundary wall takes shape, with further works on the air-raid shelter (extreme left) also continuing apace.
With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
...then smooths the concrete to the desired finish; a good job well done!