- Here's the result - all the insulation is completed, with one of the father & son team posing proudly by their efforts.
- Yet there's no time to stop...attention is turned to the second loft space above the west-end of the Panel.
- The front entrance continues to progress, the latest addition being the rather smart reclaimed railway lamppost on the right...looks like yet more work for David and fellow electricians!
- In the same day as the insulation being completed, the plasterboard is up to complete the second loft space - fantastic work!
- Inside the Bristol East Panel room, the lamp body awaits its turn to be restored to working order.
- The Simulator Room as you've never seen it before! The walls are painted, the electrics tested, and the ceiling is up and plastered.
- Meanwhile, electrician David continues to finalise the wiring in the early signalling area, in readiness for fitments.
- A taste of what's to come: in one day, the suspended ceiling grid is fitted to the Swindon Panel room.
- From another angle, some ceiling tiles are already shown in final position - shows just how far we've all come.
- Now for some panoramic trickery! From a vantage point next to the window, the extent of the ceiling grid can be seen.
- They say the camera never lies...yet, don't worry, the ceiling grid isn't bowed! Another panoramic shot from behind the Panel, looking towards the Bristol East Panel room.
- The rest of the ceiling tiles remain carefully stored, as installing the lighting fitments will come first.
- Let there be light! (1) - GWS electrician David Brown test fits the first LED fitment to the Panel Room suspended ceiling.
- Let there be light! (2) - Stephen Lear admires the latest loft installation.
- The second loft space (above the east end of the panel) is similarly fitted, meaning both loft spaces are nearly completed - excellent work!
- The main row of lights, which will sit directly above the Panel frontage, are installed prior to moving the panel to its final position.
- In readiness for the move, equipment and materials in store behind the panel are moved forward...just a few trips up to the new loft then!
- The new roller shutter is installed behind the front doors, and is tested in situ.
- As if the double doors weren't enough for the GWS volunteers, the simulator room's door is intalled, and just awaits some final fittings.
- Meanwhile, in the 'Bristol Room', Chris Chalet of the GWS Bristol Group continues the hard work of preparing the Bristol East Panel interactive exhibit - good stuff!
- More restored exhibits take their place in the Brunel Room.
- The result of very careful planning and design work, the new air conditioning units in the panel room are installed...
- With the air-conditioning units in, surrounding ceiling tiles start to be installed, having been cut to size accordingly.
- Ever more ceiling tiles become fitted in place, with the 1980s panel room atmosphere truly starting to take shape.
- The Bristol Room's well-disguised air-conditioning unit is also installed.
- ...which in turn are linked into the building management system to keep us all cosy (especially in March!).
- New boards are fabricated and painted, ready for future displays.
- The panel room double doors' lintel is expertly fashioned.
- The previously-seen display boards are fitted into their final positions, with the displays themselves well underway.
- Excellent restoration is evident on these reclaimed GW doors, in readiness for their installation as our panel room external access doors.
- A view from the entrance foyer into the 'Brunel Room', as newly-redundant scaffolding makes its way out of the building.
- Building works continue apace, as does work on the installation of new exhibits - these broad-gauge relics really do look the part!
- Not to be forgotten, the panel room suspended ceiling is pushed ever closer to completion, courtesy of Jamie Karslake.
- David Brown and Richard Beacham tackle the installation of conduit through the lamp post, which will illuminate the way into the new centre.
- With the lamp post in shot, the sandbag wall for the air-raid shelter steps is rebuilt around the new electrics cabinet.
- The Frome North Box plate is mounted to the wall, joining the growing number of restored Brunel Room exhibits.
- Another great moment, as the reclaimed GW doors for the panel room are installed, with some fitments already in evidence.
- Around the corner, a final view of the finished side walkway, complete with air-conditioning equipment (well-hidden from most views by the carefully-placed wall section on the left).
- An updated building front entrance view, as fencing and railing posts continue to be worked upon.
- GWS Civil Engineering Manager demonstrates the fully fitted-out double doors, set of keys in hand!
- Taken a mere ten days before the Grand Opening, the Swindon Panel Box plate is seen in its final position, with the home signal waiting to greet our first visitors!