Home / Building Construction / March 2018 14
Post date / 2019 / January
- The previously-seen display boards are fitted into their final positions, with the displays themselves well underway.
- Ever more ceiling tiles become fitted in place, with the 1980s panel room atmosphere truly starting to take shape.
- More restored exhibits take their place in the Brunel Room.
- The panel room double doors' lintel is expertly fashioned.
- Meanwhile, in the 'Bristol Room', Chris Chalet of the GWS Bristol Group continues the hard work of preparing the Bristol East Panel interactive exhibit - good stuff!
- A view from the entrance foyer into the 'Brunel Room', as newly-redundant scaffolding makes its way out of the building.
- New boards are fabricated and painted, ready for future displays.
- With the air-conditioning units in, surrounding ceiling tiles start to be installed, having been cut to size accordingly.
- As if the double doors weren't enough for the GWS volunteers, the simulator room's door is intalled, and just awaits some final fittings.
- ...which in turn are linked into the building management system to keep us all cosy (especially in March!).
- The result of very careful planning and design work, the new air conditioning units in the panel room are installed...
- Excellent restoration is evident on these reclaimed GW doors, in readiness for their installation as our panel room external access doors.
- Building works continue apace, as does work on the installation of new exhibits - these broad-gauge relics really do look the part!
- The Bristol Room's well-disguised air-conditioning unit is also installed.