Home / Building Construction / March 2018 5
Creation date / 2018 / Week 12
- The result of very careful planning and design work, the new air conditioning units in the panel room are installed...
- With the air-conditioning units in, surrounding ceiling tiles start to be installed, having been cut to size accordingly.
- Ever more ceiling tiles become fitted in place, with the 1980s panel room atmosphere truly starting to take shape.
- The Bristol Room's well-disguised air-conditioning unit is also installed.
- ...which in turn are linked into the building management system to keep us all cosy (especially in March!).