Home / Building Construction / November 2017 3
Post date / 2017 / November / 26
- Just a little bit of sealing remaining at the front of the panel, to be completed the following evening...then a careful panel move backwards remains
- With cleaning done, Peter seals the remaining concrete floor space that was under the panel, while Paul reattaches 8-core cables to repaired circuit boards...watch out for that wet floor behind you Paul!
- With electronics work pushed on, time for a good tidy-up! Peter cleans while Paul tightens the supporting framework post-panel move forward