Home / Building Construction / Work Week August 2017 7
Creation date / 2017 / Week 33
- There's still plenty of tag block work to complete, yet Jamie's rapid soldering skills mean that Swindon Station is getting ever closer.
- Behind the panel, John installs the first PCB into Rack 1, the final rack to receive them - well done that man!
- Meanwhile, the Bristol Group install the first lamps back into their Bristol East panel - can you spot them among all that daylight?
- Outside, the new pathway boundary wall takes shape, with further works on the air-raid shelter (extreme left) also continuing apace.
- Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
- With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
- ...then smooths the concrete to the desired finish; a good job well done!