As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.

20170620_174507.jpg Building works continue, with the two loft areas receiving their flooring.ThumbnailsOutside, the new pathway boundary wall takes shape, with further works on the air-raid shelter (extreme left) also continuing apace.

As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.