Swindon Panel Preservation Photo Gallery

Photgraphic archive of Swindon Panel and the Swindon Panel Society

Please visit www.swindonpanel.org.uk for more information on Swindon Panel Preservation.

Home / Building Construction /

As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.

20170620_174507.jpg IMG 20170709 151125339ThumbnailsBuilding works continue, with the two loft areas receiving their flooring.

As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.