- David, with cutters to the fore, trims back cable ties from tidied cable runs & works on the labelling system.
- Tiles now carefully sorted & stored on polystyrene sheets for potential future use.
- Another working day: John begins by stripping down our spare dominos stock into their respective pieces.
- Meanwhile, Peter continues the terminating & soldering of 8-core cables at the tag blocks...plenty of practice still available for those that want it!
- The finished article: an easy to identify, very neat end result - a great improvement!
- With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
- ...then smooths the concrete to the desired finish; a good job well done!
- Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
- 18835617 2298662147025737 5351825391619793250 n
- 18920432 2298662117025740 7715164036857369911 n
- P1070212
- P1070184
- P1070183
- P1070181
- P1070180
- challow
- Electricians 09 22 January 2017 small
- Electricians 07 22 January 2017 small
- Screen Shot 2017-01-25 at 11.48.31
- Screen Shot 2017-01-25 at 11.48.44
- Screen Shot 2017-01-25 at 11.49.00
- Screen Shot 2017-01-25 at 11.49.39
- Screen Shot 2017-01-25 at 11.49.07
- Screen Shot 2017-01-25 at 11.49.15
- Screen Shot 2017-01-25 at 11.49.24
- Screen Shot 2017-01-25 at 11.49.32
- Uff
- 2017-01-15 11.38.28