Home 34
Creation date / 2018 / All / Sunday
- Panel operating 19 August 2018 04 small
- Panel operating 19 August 2018 03 small
- Panel operating 19 August 2018 02 small
- Panel operating 19 August 2018 01 small
- Panel operating 18 August 2018 02 small
- Panel operating 18 August 2018 03 small
- Panel operating 18 August 2018 01 small
- Goods loop 2 small
- Goods loop 1 small
- Wootton Bassett junction small
- Swindon panel Uffington loop small
- Swindon station small
- Panel operating 19 August 2018 14 small
- Panel operating 19 August 2018 13 small
- Panel operating 19 August 2018 12 small
- Panel operating 19 August 2018 11 small
- Panel operating 19 August 2018 10 small
- Panel operating 19 August 2018 09 small
- Panel operating 19 August 2018 08 small
- Panel operating 19 August 2018 07 small
- Panel operating 19 August 2018 06 small
- Panel operating 19 August 2018 05 small
- 31223520 889635174579266 5690808375592353792 n
- Around the corner, a final view of the finished side walkway, complete with air-conditioning equipment (well-hidden from most views by the carefully-placed wall section on the left).
- Another great moment, as the reclaimed GW doors for the panel room are installed, with some fitments already in evidence.
- 29572321 841764042699713 6841685517142167208 n
- 29594414 841764046033046 9102840563339574988 n
- As if the double doors weren't enough for the GWS volunteers, the simulator room's door is intalled, and just awaits some final fittings.
- In readiness for the move, equipment and materials in store behind the panel are moved forward...just a few trips up to the new loft then!
- The main row of lights, which will sit directly above the Panel frontage, are installed prior to moving the panel to its final position.
- The second loft space (above the east end of the panel) is similarly fitted, meaning both loft spaces are nearly completed - excellent work!
- Let there be light! (2) - Stephen Lear admires the latest loft installation.
- Meanwhile, electrician David continues to finalise the wiring in the early signalling area, in readiness for fitments.
- The Simulator Room as you've never seen it before! The walls are painted, the electrics tested, and the ceiling is up and plastered.