- Swindon panel 3 small
- Swindon panel 2 perspective corrected small
- Swindon panel 2 crop small
- Swindon panel 1 small
- ...then smooths the concrete to the desired finish; a good job well done!
- With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
- Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
- ...whilst other completed PCBs proudly state their country of origin!
- Outside, the new pathway boundary wall takes shape, with further works on the air-raid shelter (extreme left) also continuing apace.
- Meanwhile, the Bristol Group install the first lamps back into their Bristol East panel - can you spot them among all that daylight?
- Behind the panel, John installs the first PCB into Rack 1, the final rack to receive them - well done that man!
- There's still plenty of tag block work to complete, yet Jamie's rapid soldering skills mean that Swindon Station is getting ever closer.
- IMG 8888.1
- IMG 8887.1
- IMG 8886.1
- IMG 8885.1
- IMG 8895.1
- IMG 8894.1
- IMG 8891.1
- Rushey Platt