Home / Search results 9

The completed suspended ceiling (with one tile temporarily removed for access) - fantastic!
GWS Civil Engineering Manager demonstrates the fully fitted-out double doors, set of keys in hand!
The Frome North Box plate is mounted to the wall, joining the growing number of restored Brunel Room exhibits.
Another great moment, as the reclaimed GW doors for the panel room are installed, with some fitments already in evidence.
Not to be forgotten, the panel room suspended ceiling is pushed ever closer to completion, courtesy of Jamie Karslake.
Around the corner, a final view of the finished side walkway, complete with air-conditioning equipment (well-hidden from most views by the carefully-placed wall section on the left).
David Brown and Richard Beacham tackle the installation of conduit through the lamp post, which will illuminate the way into the new centre.
An updated building front entrance view, as fencing and railing posts continue to be worked upon.
With the lamp post in shot, the sandbag wall for the air-raid shelter steps is rebuilt around the new electrics cabinet.