- 20151107220101-0756005a
- UoB 09 small
- UoB 08 small
- UoB 07 small
- UoB 06 small
- UoB 05 small
- UoB 04 small
- UoB 03 small
- UoB 02 small
- UoB 10 small
- UoB 01 small
- 1 September 2018 10 small
- 1 September 2018 09 small
- 1 September 2018 08 small
- 1 September 2018 07 small
- 1 September 2018 06 small
- 1 September 2018 05 small
- 1 September 2018 03 small
- 1 September 2018 04 small
- 1 September 2018 02 small
- 1 September 2018 01 small
- 1 September 2018 15 small
- 1 September 2018 14 small
- 1 September 2018 13 small
- 1 September 2018 12 small
- 1 September 2018 11 small
- Swindon panel 3 small
- Swindon panel 2 perspective corrected small
- Swindon panel 2 crop small
- Swindon panel 1 small
- Panel operating 19 August 2018 04 small
- Panel operating 19 August 2018 03 small
- Panel operating 19 August 2018 02 small
- Panel operating 19 August 2018 01 small
- Panel operating 18 August 2018 02 small
- Panel operating 18 August 2018 03 small
- Panel operating 18 August 2018 01 small
- Goods loop 2 small
- Goods loop 1 small
- Wootton Bassett junction small
- Swindon panel Uffington loop small
- Swindon station small
- Panel operating 19 August 2018 14 small
- Panel operating 19 August 2018 13 small
- Panel operating 19 August 2018 12 small
- Panel operating 19 August 2018 11 small
- Panel operating 19 August 2018 10 small
- Panel operating 19 August 2018 09 small
- Panel operating 19 August 2018 08 small
- Panel operating 19 August 2018 07 small
- Panel operating 19 August 2018 06 small
- Panel operating 19 August 2018 05 small
- They say the camera never lies...yet, don't worry, the ceiling grid isn't bowed! Another panoramic shot from behind the Panel, looking towards the Bristol East Panel room.
- Now for some panoramic trickery! From a vantage point next to the window, the extent of the ceiling grid can be seen.
- The rest of the ceiling tiles remain carefully stored, as installing the lighting fitments will come first.
- From another angle, some ceiling tiles are already shown in final position - shows just how far we've all come.
- A taste of what's to come: in one day, the suspended ceiling grid is fitted to the Swindon Panel room.
- In the same day as the insulation being completed, the plasterboard is up to complete the second loft space - fantastic work!
- Inside the Bristol East Panel room, the lamp body awaits its turn to be restored to working order.
- The front entrance continues to progress, the latest addition being the rather smart reclaimed railway lamppost on the right...looks like yet more work for David and fellow electricians!
- Meanwhile, electrician David continues to finalise the wiring in the early signalling area, in readiness for fitments.
- Here's the result - all the insulation is completed, with one of the father & son team posing proudly by their efforts.
- Yet there's no time to stop...attention is turned to the second loft space above the west-end of the Panel.
- The Simulator Room as you've never seen it before! The walls are painted, the electrics tested, and the ceiling is up and plastered.
- Success! This shot shows (just about!) all five VDUs working - another great step forward.
- More testing is done, seen here being carried out by James Nelhams and Tom Lane.
- After the all-too-brief respite of Christmas over, the team reassemble to reactivate more VDUs.