- Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
- ...then smooths the concrete to the desired finish; a good job well done!
- With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
- The finished article: an easy to identify, very neat end result - a great improvement!
- Meanwhile, Peter continues the terminating & soldering of 8-core cables at the tag blocks...plenty of practice still available for those that want it!
- Another working day: John begins by stripping down our spare dominos stock into their respective pieces.
- Tiles now carefully sorted & stored on polystyrene sheets for potential future use.
- David, with cutters to the fore, trims back cable ties from tidied cable runs & works on the labelling system.