
At the end of the day's work the ground level has been lowered and type 1 aggregate added (beyond the fence) in preparation for path-laying. In the foreground there will be paving slabs.
- Author
- Tim Miller
- Created on
- Saturday 8 October 2016
- Posted on
- Sunday 9 October 2016
- Albums
- Make
- Motorola
- Model
- Moto G (4)
- DateTimeOriginal
- 2016:10:08 17:44:24
- ApertureFNumber
- f/2.0