The cage is held together until concrete is poured over it by twisted wire. Richard Beacham is using a tool which twists the wire quickly and painlessly (for the operator).
- Author
- Didcot Railway Centre
- Created on
- Saturday 17 January 2015
- Posted on
- Wednesday 21 January 2015