Home / Building Construction / February 2018 6
Post date / 2019 / January / 4
- The new roller shutter is installed behind the front doors, and is tested in situ.
- In readiness for the move, equipment and materials in store behind the panel are moved forward...just a few trips up to the new loft then!
- The main row of lights, which will sit directly above the Panel frontage, are installed prior to moving the panel to its final position.
- The second loft space (above the east end of the panel) is similarly fitted, meaning both loft spaces are nearly completed - excellent work!
- Let there be light! (2) - Stephen Lear admires the latest loft installation.
- Let there be light! (1) - GWS electrician David Brown test fits the first LED fitment to the Panel Room suspended ceiling.