Home / Building Construction /

As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.

20170620_174507.jpg Outside, the new pathway boundary wall takes shape, with further works on the air-raid shelter (extreme left) also continuing apace.ThumbnailsBuilding works continue, with the two loft areas receiving their flooring.

As the flooring is completed, the electricians begin to install the required conduit for lighting, alarms, etc.