Home 250
Creation date / 2017 / All / Saturday
- ...whilst Jack continues wiring in PCBs that have had their cables soldered to the tag blocks & tested
- Inside the panel room, more electrics have been installed, which will control panel power.
- Peter gets to grips with tidying the various power distribution cables...
- The restoration, aided by Network Rail volunteers, has greatly improved the appearance of the site & the access to the signalling building...
- Outside, plenty of progress has been made restoring the air-raid shelter (the panel being behind the wall to the right)
- ...with the front doors now in place & operational...if only we could change our habit & not keep walking to the back door!
- Tiles now carefully sorted & stored on polystyrene sheets for potential future use.
- Another working day: John begins by stripping down our spare dominos stock into their respective pieces.
- Meanwhile, Peter continues the terminating & soldering of 8-core cables at the tag blocks...plenty of practice still available for those that want it!
- David, with cutters to the fore, trims back cable ties from tidied cable runs & works on the labelling system.
- The finished article: an easy to identify, very neat end result - a great improvement!
- ...then smooths the concrete to the desired finish; a good job well done!
- With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
- Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
- More installation & fault-finding in progress, with Danny to the fore!
- The computer desk comes into its own as panel testing continues...
- ...whilst Peter gets to grips with making as many power jumper cables for the PCBs as possible.
- Further PCB installation, with the end of the panel very much in sight - Jerry carefully threads the ribbon cable down towards the correct socket on the TC64 units.
- IMG 2927
- IMG 2926
- IMG 2925
- IMG 2924
- IMG 2923
- IMG 2922
- IMG 2921
- DSC 4928
- DSC 0155
- DSC 0154
- 20170708 144704
- DSC 0153
- DSC 0151
- DSC 0150
- IMG 7043
- DSC 4922
- IMG 20170708 141911
- IMG 7041
- DSC 0140
- IMG 7039
- IMG 7038
- DSC 4921
- DSC 4920
- DSC 4919
- DSC 4918
- DSC 0137
- DSC 0135
- DSC 0134
- DSC 4917
- DSC 4915
- DSC 4913
- IMG 20170708 134201
- DSC 0133
- DSC 4910
- DSC 0132
- IMG 2920
- IMG 2919
- IMG 2918
- DSC 0129
- DSC 0128
- DSC 0125
- DSC 4909
- DSC 4908
- DSC 4907
- DSC 0124
- DSC 0123
- IMG 20170708 131448
- IMG 20170708 131427
- DSC 4903
- DSC 4901
- IMG 20170708 131216
- IMG 20170708 131049
- IMG 20170708 131044
- IMG 20170708 131035
- DSC 4893
- IMG 7028
- DSC 4886
- DSC 4883
- DSC 0118
- DSC 0117
- DSC 0116
- DSC 0115
- DSC 0114
- DSC 0113
- DSC 0112
- 20170708 124444
- IMG 7026
- 20170708 124306
- DSC 4882
- DSC 4881
- DSC 4880
- DSC 4879
- DSC 0111
- DSC 4878
- DSC 4876
- DSC 4873
- DSC 4871
- DSC 4870
- DSC 4869
- IMG 7025
- IMG 7024
- DSC 4868
- DSC 0107
- DSC 4866
- DSC 4864
- DSC 4863
- DSC 0104
- DSC 0103
- DSC 0102
- DSC 0101
- DSC 0100
- DSC 0099
- DSC 0556
- DSC 0555
- DSC 0098
- DSC 4860
- DSC 4859
- DSC 4858
- DSC 4856
- 20170708 115226
- DSC 0553
- DSC 4854
- DSC 4850
- DSC 0096
- IMG 7021
- DSC 0552
- DSC 0551
- 20170708 113636
- DSC 0095
- DSC 0094
- DSC 4848
- DSC 0092
- DSC 0088
- Building works continue, with the two loft areas receiving their flooring.
- P1070212
- P1070184
- P1070183
- P1070181
- P1070180
- IMG 2761
- IMG 2760
- IMG 2759
- IMG 2758
- IMG 2757
- IMG 20170527 160654484 HDR
- IMG 20170527 155813703
- IMG 20170527 155808040
- IMG 20170527 155801371
- IMG 20170527 155757984
- IMG 20170527 155751763
- IMG 20170527 155734593
- IMG 20170527 155231989
- IMG 20170527 155230212
- IMG 20170527 155228784
- IMG 20170527 155221305
- IMG 20170527 155026065
- IMG 20170527 155013435
- IMG 20170527 150929399
- IMG 20170527 150759401
- IMG 20170527 150752506 HDR
- IMG 20170527 120651751
- IMG 20170527 120205023
- IMG 20170527 120151141
- IMG 20170527 120143628
- IMG 2661
- IMG 2660
- IMG 2659
- IMG 2369
- IMG 2368
- IMG 2367
- IMG 2365
- ...whilst the side path, seen here from the rear of the signalling building, is all but complete - excellent work!
- 11 March 2017 10 small
- 11 March 2017 06 small
- 11 March 2017 07 small
- 11 March 2017 08 small
- 11 March 2017 09 small
- 11 March 2017 04 small
- 11 March 2017 05 small
- 11 March 2017 02 med
- 11 March 2017 02 small
- 11 March 2017 03 small
- 11 March 2017 01 small
- 11 March 2017 18 small
- 11 March 2017 19 small
- 11 March 2017 15 small
- 11 March 2017 16 small
- 11 March 2017 17 small
- 11 March 2017 12 small
- 11 March 2017 13 small
- 11 March 2017 14 small
- 11 March 2017 11 small
- IMG 20170311 183319703
- IMG 20170311 164027185
- IMG 20170311 155515990
- IMG 20170311 153640607
- IMG 20170311 153617504
- 20170304 145417
- IMG 2338
- IMG 2336
- IMG 2335
- IMG 2334