Home 144
Creation date / All / All / 12
- IMG E3619
- IMG 3619
- IMG 3618
- Taken a mere ten days before the Grand Opening, the Swindon Panel Box plate is seen in its final position, with the home signal waiting to greet our first visitors!
- IMG 5115
- IMG 5114
- As more space becomes available at the front of the panel, Peter Woodbridge continues with the unenviable task of cleaning the panel's front and rear metal covers.
- Not content with the panel covers, Peter starts cleaning away the years of dirt from the back desk, a longer-term restoration project.
- With the air-conditioning units in, surrounding ceiling tiles start to be installed, having been cut to size accordingly.
- The result of very careful planning and design work, the new air conditioning units in the panel room are installed...
- ...then smooths the concrete to the desired finish; a good job well done!
- With the Panel behind the external wall to the right, substantial restoration works to the air raid shelter are evidenced here.
- Richard (GWS's Civil Engineering Manager), having put in place some complex shuttering, pours the concrete for the front double-door sill...
- IMG 1518
- IMG 1517
- IMG 1516
- IMG 1515
- IMG 1513
- IMG 1512
- IMG 1030
- IMG 1029
- IMG 1028
- IMG 1027
- IMG 1025
- IMG 1024
- IMG 1023
- IMG 1022
- IMG 1021
- IMG 1020
- IMG 1019
- IMG 1018
- IMG 1017
- IMG 1016
- IMG 1010
- IMG 1009
- IMG 1008
- IMG 1007
- IMG 1006
- IMG 1005
- IMG 1004
- IMG 1003
- IMG 1002
- IMG 1001
- IMG 1000
- IMG 0998
- IMG 0996
- IMG 0995
- IMG 0994
- IMG 0993
- IMG 0992
- IMG 0991
- IMG 0990
- IMG 0989
- IMG 0988
- IMG 0987
- IMG 0986
- IMG 3019
- IMG 3021
- IMG 3022
- IMG 2996
- IMG 2997
- IMG 2998
- IMG 2999
- IMG 3000
- IMG 3012
- IMG 3016
- IMG 3017
- IMG 3018
- 11998513 1050912881594679 1728348605 n
- 11942134 421048104771311 5529943275830380227 o
- Birdcage 3
- Birdcage 2
- Birdcage 1
- Building Progress
- Building Progress
- IMG 3517
- IMG 20150312 204805
- IMG 20150312 204752
- IMG 20150312 204739
- IMG 20150312 204820
- Tamping Machine "Reading Panel" in platform 3
- SN46, SN48
- SN48, Platform 1
- The site
- The space where the new building will go.
- The space where the new building will go.
- Dumper on site
- Removing chairs from sleepers
- Removing chairs from sleepers
- Removing chairs from sleepers
- Removing chairs from sleepers
- The Tool""
- Type 1
- Type 1
- Tipping the Type 1
- Type 1
- IMG 2515
- UM92
- Chippenham Relay Room
- Up RA Indicator
- SN29
- IMG 9977
- IMG 9974
- IMG 9971
- IMG 9970
- IMG 9969
- IMG 9968
- IMG 9967
- IMG 9966
- IMG 9965
- IMG 9782
- IMG 9780
- IMG 9777
- IMG 9773
- IMG 9771
- IMG 9769
- SN70 & SN670
- SN70 & SN670
- SN70 & SN670
- Approaching the Down Platform
- DM93 (with space for SN668)
- Langley Bridge (Replacement for AHB)
- DM92 & SN670R (was SN668R)
- DM90
- DM.89, SN.D2
- DM.89, SN.D2
- DM.89, SN.D2. Christian Malford Foot Crossing
- DM.87, SN.D2R (Rear of UM.87 (right))
- DM.87, SN.D2R (Rear of UM.87 (right))
- Dauntsey Bank / Wootton Bassett Incline
- DM.85
- Wootton Bassett Incline Signal Box
- DM.84
- DM.84
- SN.278
- Wootton Bassett Junction
- SN.62, SN.662
- SN.62, SN.662
- Foot Crossing - (which one?)
- W Board for foot crossing (which one?)
- DM.81, SN.662R
- DM.79 (with SN.653R (centre) and UM.79 (right) on the same gantry)
- SN.50
- SN.40, SN.42, SN.44