Swindon Panel Preservation Photo Gallery

Photgraphic archive of Swindon Panel and the Swindon Panel Society

Please visit www.swindonpanel.org.uk for more information on Swindon Panel Preservation.

Home / Panel Reconstruction /

9th May: the day comes for moving the panel into its final postion - wheel the panel backwards, then remove the wheels, channelling and framework, and lower to the floor...sounds simple, doesn't it?

20180509_113908.jpg As part of the lowering process, some rodding is now fed under the front of the panel by John Hill.ThumbnailsThe panel is shown having been wheeled back towards the rear wall, ensuring we've enough space in the future for easy maintenance, tooling, etc.

9th May: the day comes for moving the panel into its final postion - wheel the panel backwards, then remove the wheels, channelling and framework, and lower to the floor...sounds simple, doesn't it?