At the end of the day's work the ground level has been lowered and type 1 aggregate added (beyond the fence) in preparation for path-laying. In the foreground there will be paving slabs.
Photgraphic archive of Swindon Panel and the Swindon Panel Society
Please visit www.swindonpanel.org.uk for more information on Swindon Panel Preservation.At the end of the day's work the ground level has been lowered and type 1 aggregate added (beyond the fence) in preparation for path-laying. In the foreground there will be paving slabs.