Home 9
Creation date / 2017 / September
- David, with cutters to the fore, trims back cable ties from tidied cable runs & works on the labelling system.
- The finished article: an easy to identify, very neat end result - a great improvement!
- Another working day: John begins by stripping down our spare dominos stock into their respective pieces.
- Meanwhile, Peter continues the terminating & soldering of 8-core cables at the tag blocks...plenty of practice still available for those that want it!
- Tiles now carefully sorted & stored on polystyrene sheets for potential future use.
- Front doors almost in place
- ...with the front doors now in place & operational...if only we could change our habit & not keep walking to the back door!
- Outside, plenty of progress has been made restoring the air-raid shelter (the panel being behind the wall to the right)
- The restoration, aided by Network Rail volunteers, has greatly improved the appearance of the site & the access to the signalling building...