Home 23
Creation date / All / Week 40
- The restoration, aided by Network Rail volunteers, has greatly improved the appearance of the site & the access to the signalling building...
- Outside, plenty of progress has been made restoring the air-raid shelter (the panel being behind the wall to the right)
- ...with the front doors now in place & operational...if only we could change our habit & not keep walking to the back door!
- Front doors almost in place
- IMG 1023
- IMG 1022
- IMG 1021
- IMG 1020
- IMG 1019
- IMG 20160929 175510253
- IMG 20160929 174906514
- IMG 20160929 182253532
- IMG 20160929 182217554 BURST000 COVER TOP
- IMG 20160929 181623396
- IMG 20160929 175727514
- IMG 20160929 175605605
- SW1334 signal (replacement for SN.149)
- SW1334 signal (replacement for SN.149), GPL 6548 (left)
- Kemble GF levers and diagram
- Kemble GF levers and diagram
- Facing crossover at Kemble
- Kemble Ground Frame Cupboard
- The nearly-finished foundations dug out