Home 7
Creation date / 2018 / All / 12
- Taken a mere ten days before the Grand Opening, the Swindon Panel Box plate is seen in its final position, with the home signal waiting to greet our first visitors!
- IMG 5115
- IMG 5114
- As more space becomes available at the front of the panel, Peter Woodbridge continues with the unenviable task of cleaning the panel's front and rear metal covers.
- Not content with the panel covers, Peter starts cleaning away the years of dirt from the back desk, a longer-term restoration project.
- With the air-conditioning units in, surrounding ceiling tiles start to be installed, having been cut to size accordingly.
- The result of very careful planning and design work, the new air conditioning units in the panel room are installed...